The original
& Internationally patented
PERMANENT
POLYMER
FORMWORK

Dincel is Certified and Compliant

Certified
& Compliant

Dincel Structural Walling is CodeMark certified. All products and accessories are certified as being manufactured with best environmental practices PVC. VOC, acoustic, waterproofing, fire and earthquake tests and assessments have been carried out by the CSIRO, Warringtonfire, UNSW, UTS and third-party independent fire and acoustical engineers. Our products have been deemed compliant with current Australian NCC regulations for use in both internal and external applications.

Dincel is Faster and Easier

Faster
& Easier

Dincel Structural Walls consist of an internationally patented snap lock joint which connects the Dincel panels for fast and easy installation. Dincel panels allow for greater safety and manoeuvrability on-site. Dincel is lightweight, making it easy for one man to carry the product across a construction site if needed. Dincel panels can be installed relatively quickly, with two men being able to comfortably install 25m² of panels per hour.

Dincel is Cheaper and Stronger

Cheaper
& Stronger

Dincel permanent formwork achieves greater concrete strength by minimising moisture loss throughout the curing process. The permanent polymer skin also prevents moisture from entering the wall and therefore reduces the chance of corrosion to steel reinforcement and concrete cancer. Utilising Dincel load bearing walls in building designs can result in reduced concrete slab thickness and steel in floor slabs and transfer levels, resulting in less material, labour and waste. These can all be translated to real financial savings.

Dincel Products

*Please confirm with your project engineer

Dincel Applications

Dincel Structural Walling can be used in a wide range of different applications including, but not limited to, residential, education, aged care and warehouse. For more information on how Dincel Structural Walls can be used in your next project click one of the application types below.

Residential Home DevelopmentJun 2019

A formwork and scaffolding business which constructs buildings in the commercial, industrial and high-rise residential sector for private and public companies, Formscaff proudly uses Dincel Structural Walling to complete structures quickly, safely and more cost-competitively than others.

Thomas Street ProjectOct 2018

Located in the eastern Sydney suburb of Bronte, the house sits on a large sloping block. Given its location near the beach, the block is fairly sandy and is only accessible via narrow local streets.

Ceerose ApartmentsJun 2017

Providing outstanding results for its customers is a key focus for Ceerose, one of Sydney’s leading property development and construction companies.

Luxury HomesApr 2018

Winston Hills is home to a new model of luxury living in Moses Way – a private estate populated by architecturally designed multi-million dollar residences where Dincel has proved itself to be a model building material

CHC Affordable HousingJun 2017

For some, the term affordable housing might have connotations of bare necessity dwellings, perhaps similar to the threadbare commission homes of the 50s and 60s.

Residential ApartmentsJun 2017

Established in 1977, Sydney construction company Gondella Pty Ltd, has been in the industry for a long time. But rather than relying on only traditional construction techniques, it has become part of a growing number of smart builders turning to Dincel Wall to deliver time efficiency gains and cost-savings across multi-storey developments.

Bay Pavillions, ApartmentsOct 2017

Alliance Project Group Project Manager, Matt Huttary, nominates the core construction of any build as the most difficult – this can include building lift shafts and fire stairs and involves careful consideration of safety requirements, expenses and time management.

Studio ApartmentsJun 2017

Tasked with creating 25 studio apartments, a garden courtyard and a retail space on a 10 metre by 45 metre site on Sydney’s busy Parramatta Road in Annandale, architects Environa Studio and builders PRA Constructions found Dincel Structural Walling really helped them out in a tight spot

Rural Farm Fire ShelterJun 2017

Located in the picturesque Yarramalong Valley, 100km north of Sydney in the NSW Central Coast Hinterland, Greg Woon’s rural property, has been his family’s very own slice of heaven since moving there in 2000.

Once we used Dincel we never looked back again. We will use Dincel in our future projects for core construction, blade columns, internal and external walls, basement walls and water/sewage tanks and stormwater pits. Dincel is a very flexible and versatile system even for curved shaped walls.

Matt Huttary

Project ManagerAlliance Project Group

We have found the product to be cost-effective, versatile, practical and fit for its intended purpose. We would not hesitate to encourage the use of the product on future projects and will actively promote the product to Structural designers and Architects.

Michael Musarra

Project ManagerA W Edwards

Key advantages over other walling systems including less cranage due to the lightweight nature of the panels, the speed of construction and the cost advantages in supply and installation.

D. O'Sullivan

General ManagerBKH Group

I highly recommend using the Dincel Construction System in multi-level apartment construction as the time and cost savings cannot be compared to any other known methods in the construction industry.

Michael Owen

Project ManagerCHC Affordable Housing

We have come to appreciate the product's benefits in performance, being of light weight material manual handling injuries or risk of injuries are reduced, no stripping is required as per conventual formwork wall systems improving site logistics and housekeeping.

Michael Petracca

Project SupervisorDe Martin & Gasparini

We have taken advantage of utilising the Dincel load-bearing walling system, this combination provides maximum speed and efficiency in building construction and significant material cost savings. The product also reduces the potential risk of injuries.

Victor J Essey

Managing DirectorGondella

The Dincel system allows formwork placement to begin on Day 1 which takes vertical elements off critical path and reduces the cycle time. The Dincel system is not reliant on crane time which allows the crane to do the general lifting.

George Argyou

Construction DirectorHickory Group

We found the use of Dincel wall has resulted in major cost savings in our projects. Dincel further reduces builder's liability, your patented snap connection allows faster and safer erection method without having additional safety platform.

Steven Tambouras

DirectorMendri

110mm Dincel Walls were used to achieve a Fire Rating Level of 90/90/90 and Dincel Walls do not require horizontal reinforcement for crack control purposes.

Andrew Tetlow

Construction ManagerPinnacle

Significant cost effectiveness, major construction time savings and enhanced construction safety. The system is simple, flexible and practical enough to be installed by construction trades with minimum skill and training level.

Brett Granter

DirectorUltrafloor

These walls were installed without the need of waterproof membranes, scaffolding, horizontal wall reinforcement and joints in a very short space of time. We would not hesitate to encourage the use of the product on future projects.

Michael Kouknas

Project ManagerWatpac Construction NSW

Resources

Dincel Structural Walling has a comprehensive resource centre providing information on Dincel applications for Builders, Architects, Engineers and Formworkers. These tools cover information such as technical manuals and install guides, specification and design tools, brochures and ordering information. For further information call us on 1300 DINCEL.

Dincel Training Academy signup
Our FREE training workshops are available in NSW (Kemps Creek), VIC (Dandenong South) and QLD (Yatala) and last for approximatley 3 hours. Find out more